-A)Interlooking Steel Piles
1) Bringing in & removing plant - Item
2) MAintain plant on site- Item
Permanent Piles
3) Total area of piles - m2
4) Total driven area - m2
5) Corner piles - No
6) Cut Piles to form holes - No
7) Cut off piles heads - m
Piles to be extracted
8) Total area of Piles - m2
9) Total Driven area - m2
B)Site Clearance
Alternative 1
1) Clearing undergrowth - m2
2) Cutting down trees( n.e. 300, 300-600, 600-900.... gth) - No
3) Cutting down hedges - m
Alternative 2
1 ) Site Clearance - m2
C)Frame
1) Concrete for column - m3
2) Formwork for column - m2
3) Reinforcement bars for column - m ( then change to kg)
4) LInks for Column - m ( then change to kg)
5) Concrete for Beam - m3
6) Formwork for Beam - m2
7) Reinforcement bars for Beam - m ( then change to kg)
8) Stirrups for Beam - m ( then change to kg)
Suspended Floor
1) Concrete for Floor Slab - m3
2) Formwork work for floor slab - m2
3) Fabric ( m2) or reinforcement bar (m) for floor slab - (change to Kg)
Internal Wall
1) Half brick (around 115mm) wall - m2
2) waterproofing - m
3) Concrete for stiffener - m3
4) Formwork for stiffener - m2
5) Reinforcement bar for stiiffener -m (change to Kg)
External Wall
1) One Brick wall (around 230mm) - m2
2) waterproofing - m
Internal Floor Finishes
1) Cement Render- m2
2) Screed for carpet - m2
3) Underlay - m2
4) Carpet - m2
5) Sceed for Ceramic tiles -m2
6) Ceramic tiles - m2
7) Sceed for Marble -m2
8) Marble - m2
9) Sceed for Skirting - m
10) Skirting - m
11) Devidind strip - m
Piling
Pad Footing
1. Excavation top soil - m2
2. Excavation to reduce level - m3
3. Excavation pit for pad foundation - m3
4. Extra over-in rock excavation - m3
Footing
5. Lean Concrete - m3
6. Concrete in pad footing - m3
7. Formwork for pad footing - m
8 rebar in pad footing - m/kg
ROOF STRUCTURE
1. wall plate - m
2.rafter
a.common rafter - m
b.hip rafter - m
c.valley rafter - m
d.jack rafter - m
e.crown rafter - m
3.ridge board - m
4.batten - m
5.ceiling joints - m
ROOF COVERING
1.roof tile - m2
2.hip tile - m
3.ridge cap - m
4.flashing - m
5.verge tiles - m
6.apex tiles - no
7.fair ends - no
8.insulation - m2
FASCIA BOARD
1.fascia board - m
RAINWATER INSTALLATION
1.RWDP - m
2.gutter - m
3.RW outlet - no
PAINTING
1.painting to fascia board - m